DES-1241 Sample Questions

DES-1241 Sample Questions & Answers

Diagnosing hardware faults with LEDs and PowerStore Manager alerts is the single biggest topic, alongside network configuration for Ethernet switching, ESD handling during maintenance, non-disruptive software upgrades, racking, and power or data cabling.

Launch the full DES-1241 simulator →

Showing 10 of 20 free samples.

  1. Question 1Beginner

    PowerStore Installation · PowerStore Racking Considerations

    A consultant is planning the installation of a 4-appliance PowerStore 3200T cluster with two 25-drive expansion enclosures per appliance. What is the total rack space (in rack units, U) required for this hardware configuration?

    Show answer & explanation

    Correct answer: D

    Each PowerStore base enclosure (appliance) requires 2U of rack space. Each 25-drive expansion enclosure also requires 2U of rack space. The calculation for one appliance and its two expansion enclosures is 2U (base) + 2U (exp) + 2U (exp) = 6U. Since there are four identical appliances in the cluster, the total rack space required is 4 appliances * 6U/appliance = 24U.

  2. Question 2Intermediate

    PowerStore Cabling · Back-End Cabling

    When cabling a PowerStore T base enclosure to its first expansion enclosure using the back-end SAS ports, what is the correct cabling scheme to ensure high availability and proper connectivity?

    Show answer & explanation

    Correct answer: A

    This describes the correct, redundant cabling path. Node A's embedded module SAS port connects to Link Control Card (LCC) A on the expansion enclosure, and Node B's embedded module SAS port connects to LCC B. This creates two independent paths to the expansion drives, ensuring that the failure of a single node, cable, or LCC does not result in a loss of access to the expansion enclosure.

  3. Question 3Advanced

    Software Upgrades · Performing Software Non-Disruptive Upgrade

    An administrator is performing a Non-Disruptive Upgrade (NDU) on a two-appliance PowerStore T cluster. The process begins, and the upgrade is applied to the first node of the first appliance. What is the state of I/O processing on the peer node of that appliance during this specific phase of the upgrade?

    Show answer & explanation

    Correct answer: D

    The core principle of a Non-Disruptive Upgrade is the seamless failover of operations. When one node in an appliance is being upgraded (which includes a reboot), its peer node automatically and transparently takes ownership of all its resources and I/O responsibilities. This ensures that host access to storage remains uninterrupted throughout the process. This is a fundamental aspect of PowerStore's high-availability architecture.

  4. Question 4Beginner

    Troubleshooting · Troubleshooting with PowerStore Node Service Port

    A technician is on-site to troubleshoot a PowerStore 500T that is inaccessible over the management network. The technician cannot ping the cluster management IP address. Direct connection to the node service ports is required. What is the default IP address of the service port on a PowerStore node?

    Show answer & explanation

    Correct answer: C

    The default service LAN port IP addresses for PowerStore nodes are fixed for direct access troubleshooting. Node A is 128.221.1.250 and Node B is 128.221.1.251. A technician must manually configure their laptop's network interface to be on the same subnet (e.g., 128.221.1.249 with a subnet mask of 255.255.255.0) to connect to these ports.

  5. Question 5Intermediate

    PowerStore Concepts and Features · PowerStore System and Use Cases

    A healthcare organization is selecting a PowerStore model for a new VDI environment. Key requirements are high performance for boot storms, simplicity of management within their existing vSphere environment, and the ability to run a small administrative virtual machine directly on the storage appliance. Which PowerStore model family best fits these requirements?

    Show answer & explanation

    Correct answer: C

    PowerStore X models are uniquely suited for this scenario. They have an embedded VMware ESXi hypervisor, which enables the 'AppsON' feature. This allows virtual machines to run directly on the appliance, fulfilling the requirement to host a small administrative VM. The direct integration with vSphere simplifies management for VDI environments, and the all-flash architecture provides the high performance needed for boot storms. PowerStore T models provide storage but cannot run VMs directly on the array.

  6. Question 6Advanced

    PowerStore Implementation · Ethernet Switching, Network Requirements, and Configuration Options

    Case Study:

    A mid-sized e-commerce company has purchased a PowerStore 5200T appliance. A junior platform engineer racked the base enclosure, connected power, and cabled ports 0 and 1 of each node's 4-port card (25GbE) to two top-of-rack switches. The switch ports are trunks that allow the iSCSI VLAN and the tagged management VLAN. No other cables were connected.

    Using a laptop on the node A service port, the engineer completed the Initial Configuration Wizard with the correct management VLAN ID and IP addresses. Afterwards, the cluster management IP address cannot be reached from the corporate network.

    What is the most likely cause?

    Show answer & explanation

    Correct answer: D

    The Networking Guide for PowerStore T models states that at least one out-of-band management switch is required, connected through the 1 GbE management port on each node. All management traffic (PowerStore Manager, REST API, CLI, DNS, NTP and SupportAssist) is transported through that dedicated port. Cabling only the 4-port card ports therefore leaves the management network with no path, even when the VLAN ID is correct. The management VLAN can be tagged: the guide shows a tagged management VLAN option, with remote discovery staying on the native VLAN. The 4-port card ports carry VLAN-tagged storage networks. Connecting each node's 4-port card ports to both ToR switches is Dell's recommended redundant layout (each node should connect to all linked switches), not a loop.

  7. Question 7Beginner

    PowerStore Maintenance · ESD Handling Procedures

    What is the primary purpose of following strict Electrostatic Discharge (ESD) handling procedures when replacing components like DIMMs or I/O modules in a PowerStore appliance?

    Show answer & explanation

    Correct answer: C

    The primary purpose of ESD precautions, such as wearing a wrist strap connected to a grounding point on the chassis, is to safely equalize the electrical potential between the engineer's body and the appliance. This prevents the sudden discharge of static electricity, which can be imperceptible to a human but is powerful enough to destroy the delicate integrated circuits in components like DIMMs, CPUs, and I/O modules.

  8. Question 8Intermediate

    Troubleshooting · Performing PowerStore Data Collection

    An engineer needs to collect a comprehensive support bundle from a PowerStore cluster that is experiencing intermittent performance degradation. The engineer wants to ensure the data collection includes detailed performance metrics from the last 24 hours. Which method should be used to initiate this data collection?

    Show answer & explanation

    Correct answer: B

    PowerStore Manager gathers support materials from Settings > Support > Gather Support Materials. The administrator enters a description, selects a Collection Timeframe (a preset or a custom range), and chooses the object type and the appliances. The bundle can be sent to Support automatically when it finishes. Setting a timeframe gives a smaller, more relevant collection of the system logs, configuration details and other diagnostic information used to analyze performance issues. PSTCLI has no data_collect object. svc_diag list only lists diagnostic information; the service script that builds bundles is svc_dc. Powering down a node is disruptive and is not a collection method.

  9. Question 9Beginner

    PowerStore Maintenance · PowerStore CRUs and FRUs

    What is a key difference between a Customer Replaceable Unit (CRU) and a Field Replaceable Unit (FRU) in the context of PowerStore maintenance?

    Show answer & explanation

    Correct answer: C

    By definition, a Customer Replaceable Unit (CRU) is a part the customer can replace by following the published procedure, without a service technician. A Field Replaceable Unit (FRU) is replaced by trained service personnel. For PowerStore, Dell's customer-replaceable list (KB 000250908, PowerStore Customer Replaceable Part Videos) includes drives, power supplies, fan modules, embedded modules, 4-port cards, SFPs, I/O modules, memory modules (DIMMs), internal M.2 boot modules, nodes and SAS expansion LCCs, and the Installation and Service Guide gives a customer procedure for each. CRU status says nothing about downtime: a PSU or drive is hot-swapped, but a DIMM or fan module needs its node powered down first. Warranty coverage does not depend on the category, and neither term refers to software patches.

  10. Question 10BeginnerSelect 3

    PowerStore Implementation · Initial Configuration Steps

    A platform engineer is running the Initial Configuration Wizard on a new PowerStore 1000X appliance. Which three networks does the wizard configure? (Select THREE)

    Show answer & explanation

    Correct answers: A, C, D

    The Initial Configuration Wizard on a PowerStore X model sets up the management network. It needs five IP addresses per appliance, including two for the internal ESXi hosts, plus the cluster IP.

    The Initial Configuration Wizard on a PowerStore X model sets up the storage network. It needs addresses for the iSCSI targets and the ESXi initiators. It also carries replication and block import traffic.

    The Initial Configuration Wizard on a PowerStore X model sets up the vMotion network. It needs two IP addresses per appliance. vSphere uses it to migrate VMs within the cluster.

Ready for the real thing?

The full DES-1241 simulator has every exam-style question, timed mode, and instant scoring.