HQT-4180 Sample Questions & Answers
New installation and initial configuration procedures carry the biggest weight, alongside VSP Midrange models and back-end hardware, parts replacement and troubleshooting, online configuration changes, firmware updates, remote monitoring, and provisioning tools.
Launch the full HQT-4180 simulator →Showing 10 of 20 free samples.
- Question 1IntermediateSelect 2
Firmware Upgrades · Firmware Update Procedures
An installer is at a customer site to perform a firmware upgrade on a production VSP E990. The customer wants to ensure the procedure has minimal risk. What are the first two critical steps the installer must perform before starting the firmware update process? (Select TWO)
Show answer & explanation
Correct answers: B, C
- Question 2Beginner
Configuration Changes · Online Hardware Upgrades
True or False: When adding a new drive enclosure to an operational VSP E-series system, the installer must power down the entire storage system to ensure the new enclosure is detected correctly.
Show answer & explanation
Correct answer: B
VSP E-series systems support non-disruptive, online hardware upgrades, including the addition of new drive enclosures. The procedure involves carefully connecting the SAS cables to the existing back-end chain and then powering on the new enclosure. The system controllers will automatically detect the new hardware without requiring a system-wide outage.
- Question 3Intermediate
System Installation · New Installation procedure
During a 'New Installation' procedure, the installer must use the System Option Mode (SOM) to set the initial system serial number.
Show answer & explanation
Correct answer: B
The system serial number is factory-set and embedded in the system's hardware/firmware. It is not something that an installer sets or modifies using the System Option Mode (SOM) during a new installation. SOM is used for low-level configuration and recovery tasks, not for assigning fundamental system identifiers like the serial number.
- Question 4Intermediate
Remote Ops Monitoring · Hitachi Remote Ops Monitor Agent
A logistics company is installing a VSP One Block system in a remote warehouse with limited IT staff. A key requirement is proactive monitoring and automated support case creation with Hitachi Vantara. The installer has configured the system's management network settings and can access Storage Navigator. What is the next essential step to fulfill the monitoring requirement?
Show answer & explanation
Correct answer: B
The Hitachi Remote Ops Monitor Agent is the specific component responsible for 'call-home' functionality, proactive monitoring, and automatic support case creation with Hitachi Vantara. The installer must ensure this agent is configured correctly and can communicate securely with Hitachi's support infrastructure. SNMP and Syslog are for customer-facing monitoring, and creating local user accounts does not enable remote support.
- Question 5Advanced
Storage Management Tools · Port Security and Storage Presentation
An installer is creating host groups on a VSP E590 to provide storage to a cluster of VMware ESXi servers connected via Fibre Channel. To ensure proper failover and load balancing, what is the best practice for configuring the host group and host mode options?
Show answer & explanation
Correct answer: B
For a VMware ESXi cluster, the best practice is to create a single host group that includes all the World Wide Port Names (WWPNs) from all Host Bus Adapters (HBAs) in the cluster. This allows any LUN presented to that host group to be visible to all hosts simultaneously. Additionally, setting the host mode to 'VMware Extension' or a similar VMware-specific option enables advanced VAAI (vStorage APIs for Array Integration) primitives, which offloads storage tasks to the array and improves performance.
- Question 6Intermediate
System Maintenance · Problem Determination and Incident Resolution
A technician is troubleshooting a back-end connectivity issue on a VSP E790 with multiple drive boxes. They observe a solid amber fault LED on a specific SAS port on a back-end module (DKB). According to standard troubleshooting procedures, what is the most logical first step?
Show answer & explanation
Correct answer: C
Following the principle of starting with the simplest and most common cause of failure, the first step should be to address the physical connection. A fault LED on a port most often indicates a problem with the cable or its connection. The technician should check if the cable is loose, damaged, or faulty. Reseating the cable, and if that fails, replacing it with a known good cable, is the correct initial troubleshooting step before replacing more complex hardware like the DKB module itself.
- Question 7Beginner
System Installation · New Installation procedure
What is the primary purpose of the 'New Installation' procedure as defined in the VSP Midrange Family installation documentation?
Show answer & explanation
Correct answer: C
The 'New Installation' procedure is the comprehensive, step-by-step process for deploying a VSP system for the very first time. It covers everything from physical racking and cabling to initial power-on, network setup, and basic configuration, preparing the system for operational use. Other procedures cover upgrades, expansions, and maintenance.
- Question 8Intermediate
Back-End Architecture · RAID concepts
A healthcare provider is deploying a new VSP E990 to store sensitive patient data. Regulatory compliance requires that all data at rest must be encrypted. The system is licensed for encryption. During the creation of a new Dynamic Provisioning pool, what action must the installer take to ensure all data written to this pool is encrypted?
Show answer & explanation
Correct answer: B
In VSP systems, data-at-rest encryption is enabled at the RAID group level. Before a Dynamic Provisioning pool can be created on top of them, the underlying RAID groups must be formatted with the encryption feature explicitly turned on. Once a RAID group is formatted as encrypted, all data written to it (and consequently to any pools or volumes using it) will be encrypted by the storage controllers.
- Question 9Beginner
Storage Management Tools · Port Security and Storage Presentation
An installer is adding a new Fibre Channel host to a VSP E790. After zoning is completed on the SAN fabric, the installer creates a new host group in Storage Navigator. What information is required to add the host to this host group so that LUNs can be presented to it?
Show answer & explanation
Correct answer: D
For Fibre Channel connectivity, each port on a Host Bus Adapter (HBA) has a unique identifier called a World Wide Port Name (WWPN). To control storage access (LUN masking), the installer must register the host's WWPN(s) within a host group on the VSP system. This tells the storage array which specific host ports are authorized to see the LUNs presented to that group.
- Question 10Advanced
Configuration Changes · Online Hardware Upgrades
A financial firm requires a non-disruptive cache memory upgrade on their production VSP E990. The installer has verified the compatibility of the new cache modules and has the necessary documentation. Which statement best describes the high-level process for performing this online upgrade?
Show answer & explanation
Correct answer: C
The VSP E990's high-availability architecture allows for non-disruptive upgrades. For a cache upgrade, the process involves taking one controller offline from a service perspective while its partner controller handles all I/O. The cache modules on the offline controller are replaced, the controller is brought back online, and its cache is synchronized. The process is then repeated for the other controller, ensuring the system remains operational throughout the entire procedure.
Ready for the real thing?
The full HQT-4180 simulator has every exam-style question, timed mode, and instant scoring.