HPE1-H05 Sample Questions

HPE1-H05 Sample Questions & Answers

Hands-on configuration of the data ops manager and host mapping makes up the largest piece, framed by reviewing a customer's setup, gathering bill-of-materials information, sizing a new build, locking down security during migration, and advising on disaster recovery.

Launch the full HPE1-H05 simulator →

Showing 6 of 12 free samples.

  1. Question 1Intermediate

    Help customers assess current environment to make new or expansion recommendations. · Assess current environment and root cause

    True or False: To provide predictive analytics and proactive support, HPE InfoSight needs telemetry from the storage array, and the array must have a direct internet connection for this; an array that can reach the internet only through an HTTP proxy server cannot send data to InfoSight.

    Show answer & explanation

    Correct answer: B

    False. InfoSight does depend on telemetry that the array sends to HPE over HTTPS, but the connection does not have to be direct. On HPE Alletra 5000, 6000 and Nimble arrays, Administration > Network > Proxy lets the array use an HTTP proxy server (default port 8888) for features that need a secure internet connection. The array's firewall egress table lists the HTTP proxy server as a destination for this traffic. Data Ops Manager also lets you enable a proxy server for each system on its Networking tab.

  2. Question 2Intermediate

    Help the customer locate and identify necessary environment information. · Translate and execute requirements

    A customer runs AI workloads on HPE ProLiant DL385 Gen11 servers populated with multiple NVIDIA GPUs. The servers are connected directly to HPE GreenLake. Before an expansion, the customer needs historical energy consumption, estimated carbon emissions, and estimated energy cost for these servers over the last 90 days. Which HPE tool is best suited to provide this historical data?

    Show answer & explanation

    Correct answer: A

    Compute Ops Management collects the average hourly power consumption of each connected server. Its Sustainability insights show historical energy consumption, estimated carbon emissions and estimated energy cost. The default view covers the last 90 days plus a 30-day projection, for servers connected directly, through a secure gateway or through OneView. The iLO 6 power meter only graphs one server's last 20 minutes, 24 hours or week. OneView Global Dashboard is a roll-up of OneView appliances, not a 90-day energy report. Data Ops Manager manages storage. HPE InfoSight for Servers, which once offered this kind of history, has been discontinued.

  3. Question 3Advanced

    Help the customer locate and identify necessary environment information. · Translate and execute requirements

    A financial institution requires a new storage architecture for their core banking SQL databases. During requirements gathering, the customer stipulates the following constraints:

    • Absolute 100% data availability guarantee.
    • Active-Active controller architecture with symmetric access.
    • End-to-end NVMe performance.
    • Synchronous replication to a secondary site 5km away.

    As the architect translating these requirements into a Bill of Materials (BOM), which HPE storage platform must you configure to meet all these criteria?

    Show answer & explanation

    Correct answer: D

    The HPE Alletra 9000 is the only platform listed that is built on a multi-node, all-active architecture (symmetric active-active access) and comes with a standard 100% data availability guarantee, making it ideal for mission-critical Tier-0 SQL workloads. The Alletra 6000 and 5000 are based on Nimble architecture (active-standby or active-passive depending on context) and carry a 99.9999% availability guarantee.

    flowchart LR Host([SQL Server]) -->|Active Path| Node1[Alletra 9000 Node 1] Host -->|Active Path| Node2[Alletra 9000 Node 2] Host -->|Active Path| Node3[Alletra 9000 Node 3] Host -->|Active Path| Node4[Alletra 9000 Node 4] Node1 & Node2 & Node3 & Node4 --> NVMe[(NVMe Backend)]
  4. Question 4Beginner

    Help the customer locate and identify necessary environment information. · Translate and execute requirements

    After collecting workload data from a customer's environment, you need to input this information into an official HPE tool to generate a validated Bill of Materials (BOM) and verify that the proposed storage solution meets performance and capacity requirements. Which tool is designated for this task?

    Show answer & explanation

    Correct answer: C

    HPE NinjaSTARS is the official sizing and configuration tool used by presales architects to model workloads, calculate performance/capacity requirements, and generate validated configurations for HPE Storage solutions. CloudPhysics is for assessment/discovery, and GreenLake Central is for operational management.

  5. Question 5Intermediate

    Help the customer locate and identify necessary environment information. · Translate and execute requirements

    A customer reports performance degradation over their iSCSI storage network. As an architect discovering the environment, you suspect an MTU mismatch on the top-of-rack HPE Aruba CX switches. Which command allows you to locate and verify the currently configured MTU size on a specific physical interface?

    Show answer & explanation

    Correct answer: A

    On HPE Aruba Networking CX (AOS-CX) switches, show interface prints the port's state and settings. The output includes a line such as 'MTU 1500', which is the MTU applied to that interface (up to 9198 bytes with jumbo frames). show interface brief lists the port, native VLAN, mode, type, status, speed and description, but not the MTU. Adding the extended keyword shows extra statistics tables instead of the interface settings. The VLAN and system views do not report the MTU of one physical interface.

  6. Question 6Intermediate

    Design a new solution for an existing environment. · Design, size, and validate

    You are designing a new HPE Synergy solution for a high-performance computing environment. The solution requires a fully populated Synergy 12000 Frame with 12x SY 480 Gen11 compute modules equipped with high-wattage CPUs. To ensure maximum N+N power redundancy across dual facility power feeds, what is the required power supply configuration for the frame?

    Show answer & explanation

    Correct answer: D

    The HPE Synergy 12000 Frame supports up to six Titanium power supplies. For a fully populated frame running high-wattage compute modules, all six power supplies must be populated and configured in an N+N (3+3) redundancy mode across two separate facility AC feeds to ensure the frame survives a complete failure of one power feed.

Ready for the real thing?

The full HPE1-H05 simulator has every exam-style question, timed mode, and instant scoring.