3V0-25.25 Sample Questions & Answers
Deploying NSX Federation, configuring components and standing up edge clusters carries the most weight, next to designing centralized versus distributed connectivity and multisite solutions, and troubleshooting NSX infrastructure, connectivity and routing problems.
Launch the full 3V0-25.25 simulator →Showing 6 of 12 free samples.
- Question 1Intermediate
Troubleshoot and Optimize · Given a scenario, identify the appropriate VCF tool/product to troubleshoot an issue in NSX
While troubleshooting a North-South connectivity issue for a specific tenant in a multi-tenant VCF environment, an administrator needs to determine if the packet is being dropped at the Distributed Router (DR) or the Service Router (SR) component of the Tier-1 Gateway.
Which tool should the administrator use to inject a synthetic packet and visualize the hop-by-hop path through the logical routers?
Show answer & explanation
Correct answer: D
Traceflow injects a test packet and shows each hop it takes, including each gateway's DR and SR and where it was dropped. Live Traffic Analysis traces real traffic instead of a synthetic packet.
- Question 2Intermediate
Troubleshoot and Optimize · Given a scenario, describe the purpose of Equal Cost Multi-Path (ECMP) and high availability - simulations
A network architect is designing the upstream physical connectivity for an NSX Edge cluster of bare metal Edge nodes that will support high-bandwidth ECMP routing. The design requires that if a single Edge node fails, traffic should fail over in less than one second. Which protocol must be configured between the Tier-0 Gateway and the physical routers to meet this requirement?
Show answer & explanation
Correct answer: C
Bare metal Edges allow BFD timers short enough to detect a failed BGP neighbor in under a second. Traffic then moves to the other ECMP paths. Default BGP timers, 60 s keepalive and 180 s hold, are far too slow.
- Question 3Beginner
Troubleshoot and Optimize · Given a scenario, describe the purpose of Equal Cost Multi-Path (ECMP) and high availability - simulations
An administrator is configuring a Tier-0 Gateway in a VCF 9.0 environment. The requirement is to maximize North-South throughput by utilizing all available paths across 4 Edge Nodes. Which High Availability (HA) mode must be selected to support Equal Cost Multi-Path (ECMP) routing?
Show answer & explanation
Correct answer: C
Only Active-Active lets the service routers on all four Edge nodes forward north-south traffic at once, so ECMP can use every path. Active-Standby uses one Edge at a time. Preemptive and non-preemptive are its failover modes.
- Question 4Intermediate
Plan and Design · Describe and explain NSX architecture and components
A VCF architect is planning a deployment for a small remote branch office with limited hardware resources. The site requires full NSX functionality but has a constraint on the management footprint. Which VCF 9.0 supported deployment option should be chosen to minimize resource usage while maintaining functionality?
Show answer & explanation
Correct answer: B
VCF 9.0 supports a single NSX Manager node for sites that need a small footprint and can accept lower availability. A three-node cluster is still the choice when high availability matters.
- Question 5Advanced
Troubleshoot and Optimize · Given a scenario, troubleshoot common connectivity and routing issues
An administrator is configuring a new Tier-1 Gateway in NSX. The gateway must support stateful NAT services for a tenant workload. However, after configuration, the administrator notices that the NAT rules are not being applied effectively. What is the most likely configuration omission?
Show answer & explanation
Correct answer: A
NAT runs in the Tier-1's service router, and that router exists only when the Tier-1 has an Edge cluster. Without one, the Tier-1 is distributed only, so the NAT rules have nowhere to run.
- Question 6Intermediate
Deploy, Configure, and Operate VMware Cloud Foundation (VCF) · Perform operational tasks in a VMware NSX environment (syslog, backup/restore etc.)
During a maintenance window, an administrator needs to apply critical security patches to the NSX infrastructure in a VCF 9.0 environment without disrupting workload connectivity. Which feature should the administrator leverage to minimize downtime?
Show answer & explanation
Correct answer: B
In VCF 9.0 the NSX VIBs ship with ESX and support ESX Live Patch through vSphere Lifecycle Manager, with no maintenance mode or host reboot. An NSX in-place upgrade can still cause a brief traffic disruption.
Ready for the real thing?
The full 3V0-25.25 simulator has every exam-style question, timed mode, and instant scoring.