ICBB Sample Questions & Answers
All five DMAIC phases carry equal weight, from project selection and Six Sigma basics through process measurement and statistics, variation and hypothesis testing, regression and designed experiments, to lean controls and statistical process control plans.
Launch the full ICBB simulator →Showing 10 of 20 free samples.
- Question 1Intermediate
Measure Phase · Process Mapping
A hospital is experiencing delays in its patient discharge process, leading to bed shortages and patient dissatisfaction. The process involves physicians, nurses, pharmacists, and administrative staff. The project team needs to understand the flow of activities, handoffs, and decision points to identify bottlenecks.
The current process starts when a physician writes a discharge order. This triggers parallel activities: the nurse provides final patient instructions, and the pharmacy prepares take-home medications. Once both are complete, an administrator finalizes billing and paperwork. However, delays are common. Nurses are often busy with other patients, and the pharmacy can be backlogged. Sometimes, the final paperwork reveals insurance issues, sending the process back to the administrative stage and causing significant rework.
The hospital administration wants a solution that reduces the average discharge time by 30% within six months. The solution must not compromise patient safety or the accuracy of billing. The project team has collected preliminary data showing that the 'pharmacy preparation' and 'final paperwork' steps have the highest variability in completion time.
Which tool should the team use FIRST in the Measure phase to visually document the entire process, including all roles, handoffs, and decision points?
Show answer & explanation
Correct answer: A
A cross-functional flowchart, or swimlane diagram, is the ideal tool for this scenario. It visually depicts the process steps while clearly delineating which department or role is responsible for each action. This will effectively highlight the handoffs between physicians, nurses, pharmacists, and administrators, making it easier to identify delays, redundant steps, and communication breakdowns between the different functional areas.
- Question 2Beginner
Improve Phase · Simple Linear Regression
The R-squared value from a simple linear regression analysis is 0.85. What does this value indicate?
Show answer & explanation
Correct answer: D
R-squared, also known as the coefficient of determination, measures the proportion of the variance in the dependent variable that is predictable from the independent variable(s). An R-squared of 0.85 means that 85% of the variability observed in the output (Y) can be attributed to the linear relationship with the input (X).
- Question 3Beginner
Control Phase · 5S System
A manufacturing team is implementing a 5S program. They have successfully completed the first three steps: Sort, Set in Order, and Shine. What is the primary objective of the fourth step, Standardize?
Show answer & explanation
Correct answer: A
The Standardize step is focused on developing the systems and procedures that ensure the gains from Sort, Set in Order, and Shine are maintained. This includes creating checklists, standard operating procedures (SOPs), visual aids (like shadow boards or floor markings), and assigning regular duties to prevent the workspace from reverting to its former disorganized state.
- Question 4Intermediate
Measure Phase · Capability Analysis
During a process capability analysis for a normally distributed process, a Black Belt calculates Cp = 1.67 and Cpk = 0.95. What can be concluded about this process?
Show answer & explanation
Correct answer: B
Cp compares the specification width with the process spread and ignores where the process is located; Cpk also accounts for location. Minitab: 'If Cp and Cpk differ, then the process is not centered.' Cp = 1.67 means the specification width is about 10 standard deviations (1.67 x 6σ), so the spread is narrow enough to exceed the common 1.33 benchmark if the process were centered. Cpk = 0.95 means the mean is only about 2.85σ from the nearer limit, so the process is off-center and is already producing some output beyond that limit (about 0.2%). The variation is not too wide, the process is not centered, and its potential capability is high, not low.
- Question 5Intermediate
Measure Phase · Failure Modes & Effects Analysis (FMEA)
A team is conducting a Failure Modes and Effects Analysis (FMEA) on a new medical device assembly process. They have identified a potential failure mode, calculated the Severity, Occurrence, and Detection ratings, and computed the Risk Priority Number (RPN). What should the team do immediately after calculating the RPNs for all identified failure modes?
Show answer & explanation
Correct answer: A
Calculating the RPN is not the end of the FMEA process. Its purpose is to enable prioritization. The team must use the RPNs to rank the failure modes and identify the highest-risk items. Crucially, any failure mode with a high Severity rating should be given special attention, even if its RPN is not the absolute highest. After prioritization, the team's next step is to brainstorm and assign actions to reduce the risk associated with the top-priority items.
- Question 6IntermediateSelect 3
Control Phase · Poka-Yoke
Which of the following scenarios are appropriate applications of Poka-Yoke (mistake-proofing)? (Select THREE)
Show answer & explanation
Correct answers: B, D, E
A spell-check that flags errors before a form is submitted is a warning-type poka-yoke (mistake-proofing). It does not block the mistake, but it makes it obvious at once, so it is fixed before it becomes a defect.
A USB plug shaped to fit only one way is a prevention-type poka-yoke (mistake-proofing). The shape makes a wrong-way insertion physically impossible, so the error cannot happen.
Color-coding each wrench to its bolt size is a warning-type poka-yoke (mistake-proofing). The color makes the right wrench obvious at a glance, but it does not physically stop someone from picking the wrong one.
- Question 7Advanced
Improve Phase · Fractional Factorial Experiments
A project team needs to screen eight potentially significant factors to determine which ones impact the yield of a chemical process. The team has a limited budget, allowing for only 16 experimental runs. Which type of experimental design is most appropriate for this situation?
Show answer & explanation
Correct answer: A
A full factorial design with eight factors at two levels would require 2^8 = 256 runs, which is far beyond the budget. A fractional factorial design is specifically intended for screening a large number of factors with a smaller number of runs. An 8-factor, 16-run design is a common fractional factorial (specifically, a 2^(8-4) design) used to identify the 'vital few' main effects from the 'trivial many' factors, making it the most efficient and appropriate choice.
- Question 8Beginner
Define Phase · Voice of the Customer (VOC)
In the context of the Kano Model, a feature that customers explicitly ask for and which leads to satisfaction when present and dissatisfaction when absent is known as a:
Show answer & explanation
Correct answer: B
One-dimensional (or Performance) attributes are those that customers are typically vocal about. Satisfaction is proportional to the level of functionality—the more of it, the more satisfied they are, and vice-versa. These are the standard features that companies compete on, like fuel efficiency in a car or battery life in a phone.
- Question 9Beginner
Define Phase · Defining a Process
True or False: The primary purpose of a SIPOC diagram is to provide a detailed, step-by-step map of all activities within a process.
Show answer & explanation
Correct answer: B
A SIPOC (Suppliers, Inputs, Process, Outputs, Customers) diagram provides a high-level, bird's-eye view of a process. It is used to define the boundaries and scope of a project, not to detail every single step. A detailed, step-by-step map is a Process Flowchart or a Value Stream Map, not a SIPOC.
- Question 10Intermediate
Control Phase · Control Chart Analysis
A food processing plant wants to reduce the variability in the net weight of its packaged cereal. An X-bar and R chart has been used to monitor the filling process. An operator notices a pattern where seven consecutive points on the X-bar chart are all increasing, but are still within the control limits. What is the most appropriate action?
Show answer & explanation
Correct answer: A
Even though no points are outside the control limits, seven consecutive points that all increase form a trend, which is a non-random pattern and a signal of special-cause variation. Minitab's Test 3 flags six points in a row that all increase or all decrease, and the NIST/SEMATECH e-Handbook lists the same trend rule (6 in a row trending up or down), so a run of seven is past that threshold. The process should be investigated to find the assignable cause (for example tool wear or machine drift) before it produces underweight or overweight packages. Taking no action ignores the trend, recalculating the limits from the last seven points would build the drift into the limits, and a C chart counts defects, so it cannot monitor a fill weight.